“Since launch of Lyceum it's been our goal to deliver the excellence quality education n integrity to the students of Attari and nearby areas. Being a teacher of class this is a tribute not only to me but to all our staff, as we've together taken Lyceum to new heights". Our class got a result of more than 95% overall. He added later.
# | Material | Amounts | Rupees (PKR) |
1 | Bricks | 3500 | 12250 |
2 | Bajri | 50 feet | 2150 |
3 | Sand | 100 feet | 1800 |
4 | Cement | 35 bags | 8100 |
5 | Concrete pipe | 4 (12 inches) | 1850 |
6 | Sarya | 8 pieces of 2 sooter(2.5 feet) 2 pieces of 4 sooter(3 feet) | 350 |
7 | Pressure gauge,Handle valve,bush,elbow | 1,1,1,1 | 1000 |
8 | Steel pipe | 1,1 feet length(1 inch) | 200 |
No | Labor | Days | Cost (PKR) |
1 | Dump digging | 11 days | 10,800 |
2 | Dump construction | 16 days | 19,200 |
# | Schedule | Date |
1 | Class visit (First) for Site Selection | 29-Mar-10 |
2 | Start of dump digging | 1-Apr-10 |
3 | Class visit (Second) | 9-Apr-10 |
4 | Completion of digging dump | 11-Apr-10 |
5 | Class Visit (Third) | 22-Apr-10 |
6 | Start of dump construction | 22-Apr-10 |
7 | 4th class visit | 25-Apr-10 |
8 | Completion of dump construction | 07-May-10 |
9 | Construction of inlet and outlet tanks with lids | 25-May-10 |
10 | 5th Visit | 15-Jub-10 |